Mission-Critical
Connectivity Infrastructure

Custom Power Whips & Cable Assemblies. Express Turnaround.

Stop adapting your infrastructure to the slow lead times of global manufacturers. At A3 Wiring, we engineer precision electrical assemblies for Data Centers (Hyperscale, Colocation & Edge) with the agility your operation demands.

Certified quality. No 12-week wait times.

Precision Engineering to Lower Your PUE

Cable clutter (“spaghetti cabling”) is the silent enemy of energy efficiency.
Our made-to-order assemblies eliminate airflow obstruction under raised floors and behind server racks.

Operational Agility vs. Global Bureaucracy

In an environment where downtime costs thousands per minute, waiting is not an option.

Global Manufacturers

(Distributors)
12+ Weeks Lead Time
  • Standard Lengths (ft)
  • Batch Sampling
  • Call Centers / Tickets

A3 Wiring Solutions

(Direct Manufacturing)
6- Weeks Lead Time
  • Exact Custom Lengths (cm/in)
  • 100% Hi-Pot & Continuity Tested
  • Direct Application Engineering
Best Option

Manufacturing Capabilities & Specs

Engineered for High-Density and High-Performance Computing (HPC) environments.

Assembly Types

PDU Power Whips, Grounding Cables, Monitoring/Sensor Harnesses

Connectivity

NEMA (L6-20P, L6-30P, L21-30P), IEC (C13, C19, C20, 309 Pin & Sleeve)

Wire Gauge

From 12 AWG to 6 AWG (Custom gauges available upon request).

Traceability

Indelible industrial labeling including Source/Destination data and Color Coding for redundancy (Feed A / Feed B).

Frequently Asked Questions:
Data Center Cabling

A: LSZH (Low Smoke Zero Halogen) cable does not emit toxic or corrosive gases when burned. Unlike standard PVC, it protects both human personnel from smoke inhalation and sensitive electronic components from hydrochloric acid corrosion.

A: Yes. At A3 Wiring, simple continuity is not enough. Every single assembly undergoes Hi-Pot (High Potential) testing to verify insulation integrity and Pull Force testing to ensure mechanical strength.

A: Absolutely. Our facility is optimized for “High Mix, Low Volume” production. We can deliver batches of cables cut to the specific requirements of your rack rows in half the time than global.

Is a material shortage delaying your Go-Live date?

Don’t risk your deployment schedule. Speak directly with our plant engineering team today.